Hi-Tech Transpower Pvt. Ltd.
OnGoing Work
Completed Works Ongoing Works Tesing Works
 
Ongoing Works
Sr. No. Volatage Class Nature Contract Awarding Authority Nature of Contract work Value of Contract in Lacks Date of Commencement of work Schedule of Completion Remarks.
1 66 KV Semi Turnkey Project - Line Gujarat Energy Transmission Corporation Limited Erection, Testing and Commissioning of 66 KV D/C (LILO) Tower line at proposed 66 KV Khas Road (Botad-2) S/S from existing 66 KV S/C Botad (220KV) - 66KV Botad H-Frame Line on Dog Conductor 6.27 09.04.2011 08.06.2011 Conti..
2 66 KV Semi Turnkey Project - Line Varun Infrastructures
(GETCO)
Erection , Testing & comissioning of 66 KV S/C H frame from 220 KV Botad ( Samadhiyala) S/S to 66 KV Lathidad S/S on Panther Conductor 18.82 20.08.2011 19.12.2011 Conti..
3 132 KV Semi Turnkey Project - Line Gujarat Energy Transmission Corporation Limited Erection, Testing and Commissioning of 132 KV D/C (LILO) Tower line to 220KV Botad S/S from existing 132 KV S/C Barwala - Vallabhipur line on Panther Conductor 41.94 19.12.2011 18.05.2012 Conti..
4 66 KV Semi Turnkey Project - Line Gujarat Energy Transmission Corporation Limited ARC Solar Order - 66 KV DC Panther tower line 66 KV Mota Khijadiya SS from 66 KV Taraghadi SS 54.88 21.01.2012 20.05.2012 Conti..
5 66 KV Survey GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Annual rate contract for carrying out preliminary survey of various 66 KV UG cable line under contruction division Rajkot -66 KV UGC line from Ghanteswar S/S to Raiyadhar S/S 0.90 22.02.2012 21.03.2012 Conti..
6 66 KV Survey GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Annual rate contract for carrying out preliminary survey of various 66 KV UG cable line under contruction division Rajkot -66 KV UGC line from Vikram S/S to Tramba S/S 0.18 22.02.2012 21.03.2012 Conti..
7 66 KV Survey GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Annual rate contract for carrying out preliminary survey of various 66 KV UG cable line under contruction division Rajkot -66 KV UGC line from Kothariya S/S to Nilkanth S/S 0.58 22.02.2012 21.03.2012 Conti..
8 66 KV Survey GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Annual rate contract for carrying out preliminary survey of various 66 KV UG cable line under contruction division Rajkot -Shifting of 66 KV D/C Sartanpar-Lakaddhar-Matel line due to passing through & above proposed 220 KV Sartanpar S/S 0.12 22.02.2012 21.03.2012 Conti..
9 66 KV Survey GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Annual rate contract for carrying out preliminary survey of various 66 KV UG cable line under contruction division Rajkot -Shifting of 66 KV D/C Lalpar-Sartanpar-Kalikanagar line due to passing through & above proposed 220KV Sartanpar S/S 0.09 22.02.2012 21.03.2012 Conti..
10 132 KV Turnkey Project - Line Suzlon Power Infrastructure Limited Supply, Civil , Erection, Testing & Commissioning of 132KV DC ACSR Panther HOT LINE Stringing on existing DC Tower from Bhatia to Ranavav in GUJARAT. 384.99 25.02.2012 31.05.2012 Conti..
11 132 KV Turnkey Project - Line Suzlon Power Infrastructure Limited Supply, Civil , Erection, Testing & Commissioning of 132KV DC ACSR Panther Line from Suzlon Windfarm SS at Village Gunda to GETCO's Bhomiyavad SS in GUJARAT. 442.74 25.02.2012 31.05.2012 Conti..
12 132 KV Turnkey Project - Line Suzlon Power Infrastructure Limited Supply, Civil , Erection, Testing & Commissioning of 132KV DC ACSR Panther Line from GETCO's Bhomiyavad SS to common point at Sikka - Ranavav Line LILO in GUJARAT. 313.61 25.02.2012 31.05.2012 Conti..
13 132 KV Turnkey Project - Line Suzlon Power Infrastructure Limited Supply, Civil , Erection, Testing & Commissioning of Lilo Point in 132 KV DC ACSR panther bhomiyavadar LILo Line 57.80 25.02.2012 31.05.2012 Conti..
14 132 KV Turnkey Project - Line Suzlon Power Infrastructure Limited Supply of hardware & insulators for 132/33 KV SC ACSR Hot line stringing Bhomiyavadr. 64.07 25.02.2012 31.05.2012 Conti..
15 66 KV Semi Turnkey Project - Line Varun Infrastructures
(GETCO)
Erection , testing & Comissioning of 66KV D/C (LILO) tower line at Proposed 66KV Samadhiyala ( Kharkadi) S/S from, existing 66 KV Vartej-Sar-Ghodidhal S/C H frame Line on Dog Conductor 26.46 29.04.2012 28.07.2012 Conti..
16 220 KV Semi Turnkey Project - Substation Gujarat Energy Transmission Corporation Limited Structure Erection, Equipment Erection, Busbar Stringing, Jumpering, Earthing and control wiring work for 4 Nos. of 220KV Feeder Bay at 220KV Sagapara (Palitana) S/S. 23.59 20.05.2012 19.07.2012 Conti..
17 66 KV Turnkey Project - Sub Station Ruchi Soya Industries Ltd Supply, Erection , Testing & Commissioning of 25MVA- 66KV Ruchi Soya End Substation 126.84 30.10.2012 15.02.2012 Conti..
18 66 KV Turnkey Project -Sub station Ruchi Soya Industries Ltd Supply, Civil, Erection ,Bus Augmentation, Testing & Commissioning of 25MVA- 66KV GETCO End FB 45.95 30.10.2012 15.02.2012 Conti..
19 66 KV Turnkey Project - Line Ruchi Soya Industries Ltd Supply , Erection of Equipment for Installation of 13KM HT tower line from GETCO Mokha 66 KV SS to Ruchi Soya Plant. 332.36 30.10.2012 15.02.2012 Conti..
20 66 KV Semi Turnkey Project - Line Gujarat Energy Transmission Corporation Limited ARC Solar Order - 66 KV DC DOG tower line 66 KV Pavi Jetpur SS Lilo line from Exsit,. 66 KV Pavi Jetpur - Bodeli SS 76.98 27.11.2012 26.04.2013 Conti..
21 220 KV Turnkey Project - Line Ford India Pvt Ltd Supply, Erection & Commissioning of LILO/Stop gap arrangement on 220 KV line from TATA Nano at Sanand Site 36.25 18.03.2013 31.05.2013 Conti..
22 Febrication Works Semi Turnkey Project Chowgule and Company (Salt) Pvt Ltd Work Order for Dismantling, Erection and Commissioning of Jetty Main Structue 11.22 02.04.2013 11.06.2013 Conti..
23 66 KV Semi Turnkey Project Gujarat Energy Transmission Corporation Limited Lilo at new 66KV Sukhapur S/S from 66KV Anjar-Chirai-Amardi Tap line on D/C Panther Tower & M/C Tower with extension of Amradi Tap line to 66KV Sukhapur S/S with ACSR Dog Conductor. 48.97 06.04.2013 05.07.2013 Conti..
24 Civil Works Semi Turnkey Project Chowgule and Company (Salt) Pvt Ltd Work order for Civil Work at Jetty 40.58 09.04.2013 18.06.2013 Conti..
TOTAL AMOUNT (IN LACS)   2156.20
 
 
CIVIL WORK
Sr. No. Volatage Class Nature Contract Awarding Authority Nature of Contract work Value of Contract in Lacks Date of Commencement of work Schedule of Completion Date of Completion Value of work Completed in Lacks
1 220 KV Civil Job Siemens Ltd. Construction of Civil Foundation of 220 Kv Switch yard at Reliance Industries Ltd. Jamnagar. 6.17 20.07.2006 15.08.2006 15.08.2006 3.15
2 220 KV Civil Job Siemens Ltd. Construction of Fencing yard at Reliance Industries - JERP 6.76 20.08.2006 21.09.2010 15.09.2010 6.76
3 220 KV Civil Job Thermax Engineering Const. Co. Construction of Fencing yard at Reliance Utilities - Jamnagar Reliance Refinery Project - JERP 0.43 15.10.2006 25.10.2006 25.10.2006 0.46
4 33 KV Civil Job ENERCON (INDIA) LIMITED Execution of Proposed Civil work of Road work, including Construction Pavadeep & CD works at Temderai site - Rajasthan 40.19 13.01.2007 12.08.2007 12.08.2007 33.71
5 O&M Civil Job Enercon India Ltd., Bombay Consrtuction of balance civil work & Reparing of office building work at Samana Site Office 1.42 20.07.2007 30.07.2007 30.07.2007 1.42
6 33 KV Civil Job ENERCON (INDIA) LIMITED SCADA Cable trenching work with RCC 1/2 round and as per IS specification (Amendment in PO), At Bhu-Kitta - Rajasthan. 9.48 01.11.2007 10.11.2007 10.11.2007 9.48
7 Turnkey Project - Mobile Tower Civil Job INDEPENDENT MOBILE INFRASTRUCTURE PVT. LTD. Construction of Foundation for Mobile tower at Suraj Gujarat. 5.39 06.02.2008 21.02.2008 20.02.2008 5.02
8 Turnkey Project - Mobile Tower Civil Job INDEPENDENT MOBILE INFRASTRUCTURE PVT. LTD. Construction of Foundation for Mobile tower at Dharpipla Gujarat. 6.43 28.02.2008 27.03.2008 20.03.2008 6.41
9 Turnkey Project - Mobile Tower Civil Job Gujarat Energy Transmission Corporation Limited cosntruction of Retainnig wall around 66 KV H frame line , Jasadal - Mota dadava 0.90 17.05.2008 02.06.2008 25.05.2008 0.90
10 Turnkey Project - Mobile Tower Civil Job GTL LIMITED Construction of Foundation for Mobile tower at Ghoghavadar -Gujarat. 8.31 01.06.2008 30.09.2008 20.08.2008 6.63
11 66 KV Civil Job Gujarat Energy Transmission Corporation Limited Construction of New toilet block at 66 KV Kashivishwanath substation -Gondal 5.25 09.07.2008 08.10.2008 30.09.2008 2.84
12 Semi Turnkey Project - Substation Civil Job GETCO - Const. Div. Rajkot Addition / alteranation of cosnt. Civil S/Dn. At Dhudhsagar S/S compund Rajkot 5.71 13.10.2008 12.02.2009 12.02.2009 5.48
13 66 KV Civil Job Gujarat Energy Transmission Corporation Limited Const. of Foundation for Feeder Bay at 66KV Dhuva S/S 0.99 07.11.2008 06.01.2009 11.12.2008 0.71
14 Civil Job Civil Job GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Installation of earthing grid & mesh type earthing at different substation of Rajkot TR 36.05 07.11.2008 05.03.2009 05.03.2009 29.22
15 Civil Job Civil Job Gujarat Energy Transmission Corporation Limited Providing & Fixing Alluminium Window at 66KV Kharedi S/S 0.47 14.11.2008 13.12.2008 23.11.2008 0.47
16 Semi Turnkey Project - Substation Civil Job Reliance Infocom engi. Pvt. limited. Construction of Civil Foundation of Reliance Mobile Tower, Rajkot Chunarwad - RTT 1.37 21.11.2008 28.02.2009 20.01.2009 1.05
17 Semi Turnkey Project - Substation Civil Job Reliance Infocom engi. Pvt. limited. Construction of Civil Foundation of Reliance Mobile Tower Wankaner Chandrapur - GBT 2.76 25.11.2008 24.12.2008 26.12.2008 2.76
18 Semi Turnkey Project - Substation Civil Job Reliance Infocom engi. Pvt. limited. Construction of Civil Foundation of Reliance Mobile Tower Wankaner railway station road - GBT 2.76 25.11.2008 24.12.2008 26.12.2008 2.76
19 Semi Turnkey Project - Substation Civil Job Reliance Infocom engi. Pvt. limited. Construction of Civil Foundation of Reliance Mobile Tower Wankaner GIDC - GBT 2.76 25.11.2008 24.12.2008 28.12.2008 2.76
20 66 KV Civil Job Gujarat Energy Transmission Corporation Limited Extra Excavation in Black Cotton Soil to Maintain Tower Strenth in 66KV Metoda-I to Metoda-II S/S line 0.24 26.12.2008 30.12.2008 29.12.2008 0.24
21 Semi Turnkey Project - Substation Civil Job GETCO - Const. Div. Gondal Work of Const. of Damaged Chainlink Wall, Cattle trap & Watchmen cabin at 132KV Jasdan S/S. 2.86 02.01.2009 01.03.2009 28.02.2009 2.21
22 Semi Turnkey Project - Substation Civil Job GETCO - Const. Div. Rajkot Providing & Laying Vitrified Tiles in cost. S/Dn. Rajkot 0.48 02.02.2009 17.02.2009 15.02.2009 0.48
23 Semi Turnkey Project - Substation Civil Job GETCO - Const. Div. Rajkot Providing & Laying Vitrified Tiles in cost. S/Dn. Rajkot 0.43 05.03.2009 20.03.2009 19.03.2009 0.43
24 66 KV Civil Job Gujarat Energy Transmission Corporation Limited Construction of C.R. Bidg.,Foundation,Cable Trench,Comp. Wall, WBM Road etc. at 66KV Sanali S/S. 86.52 15.05.2010 14.10.2010 17.06.2011 70.25
25 66 KV Civil Job Gujarat Energy Transmission Corporation Limited Construction of C.R. Bidg.,Foundation,Cable Trench,Comp. Wall, WBM Road etc. at 66KV Kalikanagar (Lakhdhirpur) S/S. 79.99 29.05.2010 28.10.2010 05.03.2011 79.42
26 66 KV Civil Job Gujarat Energy Transmission Corporation Limited Construction of C.R. Bidg.,Foundation,Cable Trench,Comp. Wall, WBM Road etc. at 66KV Lakaddhar S/S. 78.50 05.06.2010 04.11.2010 05.03.2011 78.92
27 66 KV Civil Job Bhavnagar Bio-Mass Power Projects Pvt. Ltd. Work order for carrying out Civil Works at M/s. BBPP at Vavdi, village, Dist. - Bhavnagar 9.00 14.04.2011 31.08.2012 15.08.2011 9.00
TOTAL AMOUNT (IN LACS)   401.61   362.93